Position£ºAt
E£º118¡ã04' N£º24¡ã27'
channel/berth
condition£ºThe first phase
development of XICT is equipped
with a quay length of 640 meters
,depth alongside of 13.3meters ,and
channel capacity of 100,000 tonnages,
and is the only deep-water berth
in Xiamen Port capable of accommodating
the sixth generation container vessel,
allocating state-of -the -art quay
cranes in the port.
The second phase development under
construction of XICT will be equipped
with aquay length of 448 meters
,depth alongside of 15.5meters ,and
channel depth of 14 meters, fepresenting
the future developing direction
of container terminals and leading
Xiamen Port to become a truly container
hub port and large-scale transshipment
port on china's southeastem coast. |
|
|
facility£º4
container bridge cranes, 2 gantry
cranes, 7rubber-tyred gantry cranes,
25 flowing cranes.
The main trades include loaded and
discharged container and bulk quay
and storage and so on.
loading and
discharging time£º24 hours
365days
for ships
entering and leaving port£º
free in and out the port at any
time
The
more information in detail refers
to the website of http://www.xict.com.cn |
|
|