TRIPLE LINE
    
    
    
    
    
 
 
 
An overview Of Xiamen Harbour (Group) Dongdu Terminal Co., Ltd.

Position£ºAt E£º118¡ã04' N£º24¡ã27'
channel/berth condition£º equipped with 4 main berths, 3 x 10,000dwt and alongside the ships of 55,000dwt; quay length of coastal line of 656metres,depth of 11.7meters; 150,000centiare of stockage, 35,000centiare of warehouse, over 350,000metric ton of dock storage capacity.
facilities£º2 overhead bridges of loading and discharging; 12 gantry cranes and 300sets of all kinds of modern mechanical facilities. The rail of port links with the rail of yinxia.
Major cargo: grain, fertilizer, ore, steel etc.
loading and discharging time£º24 hours 365days
for ships entering and leaving port:£ºfree in and out the port at any time
The more information in detail refers to the website of http://www.xmdd.com.cn/.